Our company has 8 years' experience!

Our Mission

To continuously provide professional services in the field of, steel building Construction, adhering to highest quality, health, safety and environmental norms and to continuously meet the project delivery schedule.

Our Vission

To be the most preferred Pre Engineered Steel building Company in the industry with special focus and emphasis on delivering quality products and services to our clients.,

Our QUALITY POLICY

VISMA's Quality policy is to manufacture and deliver the quality products with short delivery time with competitive price to the customers and fulfill the commitments

Properitor

V.BALAJI B.E (Civil)., ME(Structures)., (Ph.D), MIE

Has over 20 years experience in the field of structural engineering and the project experience ranges from multi-story office / residential, industrial, educational, warehouse buildings. He is knowledgeable in all types of building materials and methods. His past experience includes as: Manager in Tata Consulting Engineers, Chennai (2008-2012) handled variety of buildings involved in thermal power plant, nuclear plant and various industrial structures. As Senior Design Engineer in Mithran Structures Pvt Ltd, Coimbatore (2003-2008) handled various projects of RCC multistoried buildings, Pre-engineered steel buildings, warehouses and industrial structures. Having wide knowledge and rich exposure in optimum design of Steel Structures with innovative ideas.

Has received B.E (Civil Engineering) from Coimbatore Institute of Technology in 2003, M.E(Structural engineering) from KCT (Anna University) in 2008, currently doing Ph.D research work in the area of Pre-stressed concrete structures and Member of Institution of Engineers.

Year of
Experience

30

Winning
Our Awards

25

Complet
Total Project

99

Happy
Our Clients

74

Advantages of PEB

FASTER CONSTRUCTIONS

Time saved is money earned. PEB save 50% construction time compared to conventional methods. 30,000 sft. building can be made ready for occupation within 10-12 weeks.

COST EFFECTIVE

Optimum Utilization of materials, built-to-Design steel sections, and fast construction, all lead to direct & indirect cost savings. Reduce Foundation cost with wider bay spacing.

SINGLE SOURCE RESPONSIBILITY

Project co-ordination, Construction management & Cash flow management etc. become easy, effective & predictable since youarenot dealing with lots of agencies

RE-LOCATABLE

PEB Permit future expansion & relocationthrough easy dismantling & reassembling

CUSTOM DESIGNED

To suit specific need of the customer & the location. Peace of mind guaranteed: Reputed, reliable, well equipped manufacturer undertaking the turn-key responsibility is a big relief. You can be rest assured of a quality job, delivered in time.

LARGER SPANS

Up to 60 mtr without any columns in between

Our Global Work Industries!

What Our Client Says Feedback?